Lengthening the runway, Asphalt Coating & Upgrading the old runway and Factors flight

Project Introduction:

  • Excavation: about 1,252,780 m³.
  • Embankment: about 51,780 m³.
  • Binder: 27,600 ton.
  • Topeka: 27,600 ton.

Client: Iranian Airports Holding Company

Consultant: Forudrah Consulting Engineers

Location: Sanandaj

Duration: 18 Month

Year: 2003