Kavir – Garmsar Railway Infrastructure
Project Introduction:
- Excavation: 1,100,000 m³
- Embankment: 1,125,000 m³
- Concrete: 29,000 m³
- Formwork: 70,000 m²
- Reinforcement: 1,017 ton
Client: Islamic Republic of Iran Railways
Consultant: Passillo Consulting Engineers
Plan Manager: HARAZ RAH Consulting Engineers Group
Location: Garmsar
Duration: 18 Month
Year: 2008