Tehran - Qom Highway Section-3 Improvement
Project Introduction: 56 km of Tehran - Qom Highway Improvement Topeka: 5,024,250 ton Asphalt Destruction: 3505500 ton Client: I.R. of Iran Road Maintenance & Transportation Organization Consultant: HARAZ RAH Consulting Engineers Location: Tehran Year: 2005-2006
Ahvaz Neyshekar Ways Development & Improvement Project
Project Introduction: Kenny Canal: 14,200 m³ Binder: 79,382 ton Stabilized with lime: 337,700 m³ Topeka: 34,254 ton Client: Ahvaz Employer Development of Sugar Cane Co. Consultant: HARAZ RAH Consulting Engineers Group Location: Ahvaz - Khuzestan Province Year: 2003-2005
Behesht Zahra (S) Highway Improvement
Project Introduction: Cold Recycling Asphalt: 122,000 ton Asphalt: 16,467 ton Asphalt Crashing (Scrape): 3636 ton Client: Municipality Corporation of Tehran Civil Organization Consultant: Gozar Rah Consulting Engineers Location: Tehran Year: 2003
Improvement of Bijar - Divandareh by Cold Asphalt Recycling Method
Project Introduction: Cold Recycling Asphalt: 46,000 ton Asphalt: 9,900 ton Client: Ministry of Roads and Transportation Consultant: Tadbir Forud Rah Counselor Engineers Location: Kurdistan Province Year: 2006
Improvement paved the Sabzevar – Meyami
Project Introduction: Cold recycling existing asphalt thickness of 20 cm with using Wirtgen device. Client: Ministry of Roads and Transportation Location: Semnan Province Year: 2003
Lavan Oil Refinery Asphalt Paved Road
Project Introduction: Lavan Oil Refinery asphalt paved road (9,900 ton) Client: Lavan Oil Refining Company Location: Lavan Island Year: 2009
Kavir - Garmsar Railway Infrastructure
Project Introduction: Excavation: 1,100,000 m³ Embankment: 1,125,000 m³ Concrete: 29,000 m³ Formwork: 70,000 m² Reinforcement: 1,017 ton Client: Islamic Republic of Iran Railways Consultant: Passillo Consulting Engineers Plan Manager: HARAZ RAH Consulting Engineers Group Location: Garmsar Duration: 18 Month Year: 2008
Khoramshahr - Shalamche Railway Infrastructure
Project Introduction: Railway line Retrofitting soil by stabilized with lime Client: Gharargah e Khatam al Ambiya Consultant: Metraconsult Engineering Location: Khoramshahr – Shalamche Railway Duration: 6 Month Year: 2007
Sanandaj Airport Runway Improvement and Development
Lengthening the runway, Asphalt Coating & Upgrading the old runway and Factors flight Project Introduction: Excavation: about 1,252,780 m³. Embankment: about 51,780 m³. Binder: 27,600 ton. Topeka: 27,600 ton. Client: Iranian Airports Holding Company Consultant: Forudrah Consulting Engineers Location: Sanandaj Duration: 18 Month Year: 2003
Lavan Island Airport Development and Improvement
Project Introduction: Excavation: 180,000 m³ Base & Sub base: 40,000 m³ Asphalt: 26,000 ton Flat barge transporting: 300,000 ton Concrete: 2,000 m³ Client: Iranian Offshore Oil Company (I.O.O.C) Consultant: Charkh bal Bastar Consulting Engineers Location: Lavan island (Hormozgan Province) Duration: 28 Month Year: 2007
South Pars Gas Development PH19 Onshore Facilities Site Preparation
216 hectare leveling and grading of Phase 19 of South Pars Gas Condensate Field (onshore part) in Tombak zone, east of Kangan in Bushehr province, including engineering, material provision, machine mobilization & excavation, embankment, soil transportation, dynamic compaction, fencing, flood containment and disposal, trenching, construction of site access roads, shore...
Pars Special Economic Zone Lands Stabilization and Improvement (Assaluyeh)
Project Introduction: Retrofitting more than 500 hectares of Land Asaluyeh Special Economic Zone by Lime stabilization method using Wirtgen device. Client: Pars Special Economic Energy Zone (PSEEZ) Consultant: Rah Shahr Consulting Engineers Group Location: Assaluyeh - Bid Khun Duration: 12 Month Year: 2005-2006
Hormoz Petrochemical Company Land Reclamation and Ground Improvement
Hormoz Petrochemical Company land reclamation and ground improvement in Assaluyeh Petrochemical Development Second Phase in 18 hectares area land. Deploying more than 10 special cranes for knock Dynamic compaction, various Sinker from 10 to 40 Design and construction, complete machinery and equipment Supply to operation, Density Test Operations, Embankment and...
Kian Petrochemical Company Land Reclamation and Ground Improvement
Kian Petrochemical Company Land Reclamation and Ground Improvement in Assaluyeh Petrochemical Development Second Phase in 82 hectares area land. Deploying more than 15 special Cranes for knock Dynamic compaction, various sinkers from 10 to 40 tones, static compaction and Excavation operations in three distinct land area of 51, 23 and...
Anahita Site Soil refinery operations
Site Soil Anahita refinery operations in Kermanshah province in an area of 254 hectares Provide all equipment necessary for their operation, including more than four million cubic meters of earth excavation and one million cubic meters of embankment. Client: Anahita Oil Refining Company Location: Kermanshah Duration: 4 Month Year: 2015-2016